DTI
0.023
360%
AFA
0.1
-71.4%
MRD
0.056
75%
ROG
0.003
-40%
ERA
0.003
50%
KEY
0.063
-36.4%
JAV
0.003
50%
GLA
0.016
-33.3%
EMT
0.007
40%
SPX
0.002
-33.3%
AUR
0.027
35%
FBR
0.003
-25%
C7A
0.004
33.3%
BDG
0.049
-24.6%
IMA
0.08
33.3%
TAS
0.019
-24%
VML
0.3
30.4%
TRE
0.3
-22.1%
PHO
0.125
28.9%
TM1
0.15
-18.9%
SFX
0.125
26.3%
DY6
0.13
-18.8%
AR3
0.265
26.2%
ILT
0.38
-18.3%
BVR
0.52
25.3%
CRI
0.028
-17.6%
FRX
0.012
20%
PVT
0.019
-17.4%
STG
0.43
19.4%
OVT
0.005
-16.7%
BB1
0.78
19.1%
PGY
0.005
-16.7%
AU1
0.025
19%
RR1
0.01
-16.7%
CLA
0.013
18.2%
TFL
0.005
-16.7%
UNT
0.013
18.2%
8IH
0.026
-16.1%
8CO
0.033
17.9%
SCN
0.026
-16.1%
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Pivotal Metals (ASX:PVT) discovers copper continuity at its Horden Lake Project

Pivotal Metals (ASX:PVT) has established continuity of thick copper zones at its Horden Lake play in Quebec. One drill hole revealed multiple 2-3m sections grading >2% CuEq.

  • Significant gold, silver, palladium, platinum and cobalt metals delineated once again, which were not assayed for in this part of the deposit during previous drill campaigns.
  • Consistent news-flow ahead, including results from the remaining 6,392 m / 30 diamond drill holes and downhole EM surveys to be released progressively through the quarter, followed by mineral resource update and metallurgical testwork in the second half.

Managing Director, Mr Fairhall said:
“Horden Lake delivers further confirmation of the wide zones of mineralisation indicative of the large, open-pittable copper project that has been defined on the project. The meaningful assays of palladium, gold, cobalt, platinum and silver, previously ignored, further reinforce the upside potential of this asset. Logging and analysis continues, and we expect consistent news flow over the coming months as we release assays and downhole geophysics interpretations to target both grade and tonnage upside potential on the project.”