AEV
0.009
50%
KFM
0.061
-21.8%
VTA
0.021
31.3%
CMO
0.004
-20%
HIQ
0.005
25%
SRJ
0.004
-20%
VKA
0.011
22.2%
DTZ
0.026
-18.8%
WCN
0.023
21.1%
TZN
0.019
-17.4%
A8G
0.21
20%
FAU
0.01
-16.7%
MGU
0.006
20%
PL9
0.005
-16.7%
ABE
0.037
19.4%
UNT
0.005
-16.7%
JAV
0.097
18.3%
BRY
0.011
-15.4%
HMD
0.039
18.2%
CMP
0.235
-14.5%
SLA
0.13
18.2%
AGN
0.15
-14.3%
NYM
0.053
17.8%
GEN
0.006
-14.3%
EAU
0.14
16.7%
LRM
0.018
-14.3%
INF
0.007
16.7%
M4M
0.006
-14.3%
XST
0.014
16.7%
X2M
0.006
-14.3%
KLI
0.325
16.1%
SLB
0.275
-14.1%
HVY
0.4
15.9%
NOX
0.065
-13.3%
REC
0.037
15.6%
AS2
0.007
-12.5%
AHE
0.015
15.4%
AUV
0.007
-12.5%
KOB
0.032
14.3%
MRD
0.042
-12.5%
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Cobre Limited (ASX:CBE): Commences diamond drilling in Botswana

Cobre Limited (ASX: CBE) has announced the commencement of a diamond drilling programme at its wholly owned Okavango Copper Project, Kalahari Copper Belt, Botswana. The initial 2,000m programme has been designed to test for copper-silver mineralisation. 

Highlights 

  • Given the strategic value of the Okavango Copper Project, situated along strike from MMG’s recent US$1.9B Khoemacau Copper mine and exploration tenement acquisition, successful drill testing of anomalous copper-silver mineralisation will provide significant uplift of the project value
  • The programme is scheduled to run for the next two months with results reported to the market on receipt of assays

Commentary 

Adam Wooldridge, Cobre’s Chief Executive Officer, said: “We’re excited to be drilling at the Okavango Copper Project again. The geology on this project has always been compelling and its location has become that much more strategic with MMG entering the KCB. The objective of the current programme will be to prove that anomalous copper-silver mineralisation continues into the Okavango Copper Project demonstrating potential for new discoveries in proximity to the Zone 5 production hub.”