M2R
0.003
50%
CNJ
0.02
-73.7%
RAD
0.026
44.4%
NAE
0.002
-33.3%
MEM
0.004
33.3%
SPX
0.002
-33.3%
VKA
0.009
28.6%
RKB
0.003
-25%
RDN
0.005
25%
TAR
0.018
-25%
DRO
2.83
23%
OEL
0.004
-20%
NFM
0.017
21.4%
TDO
0.14
-17.6%
4DX
2.95
20.9%
BMO
0.033
-15.4%
VAR
0.006
20%
AX8
0.006
-14.3%
PTX
0.11
18.3%
BNL
0.006
-14.3%
BLU
0.007
16.7%
ECS
0.006
-14.3%
GLL
0.007
16.7%
ENV
0.006
-14.3%
MGL
0.245
16.7%
SER
0.006
-14.3%
VSR
0.035
16.7%
AZY
0.537
-13.4%
EOS
7.44
15.2%
ALM
0.007
-12.5%
BKB
0.8
15.1%
MML
0.028
-12.5%
SNX
0.031
14.8%
PL9
0.007
-12.5%
HPG
1.385
14.5%
SRJ
0.014
-12.5%
CLX
2.15
13.2%
GG1
0.185
-11.9%
MQR
0.009
12.5%
D3E
0.305
-11.6%
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Mamba Exploration (ASX:M24) has commenced drilling at The Canary Project

Mamba Exploration (ASX:M24) commences inaugural drill program at Canary Uranium Project

  • Drilling commenced at Canary Uranium Project, Athabasca Basin, Saskatchewan, Canada on May 8th, 2024.
  • The Project is situated in the Mudjatik geological domain where several recent discoveries have been made.
  • Approximately 1,000-1,500 metres are planned across 3-4 drill holes, targeting shallow high-grade unconformity-related uranium mineralisation.
  • Drill plans comprise helicopter-supported diamond drilling focused on high-priority unconformity-related robust and shallow drill uranium targets refined by geophysical work completed by Standard Uranium in 2022.
  • Ideal unconformity and basement target zones on the Project lie within approximately 200-350 metres below surface.
  • One diamond drill hole will focus on the highest-priority target area along the northern electromagnetic corridor, investigating a significant resistivity anomaly coincident with modelled VTEM conductors for the first time.