AEV
0.009
50%
KFM
0.061
-21.8%
VTA
0.021
31.3%
CMO
0.004
-20%
HIQ
0.005
25%
SRJ
0.004
-20%
VKA
0.011
22.2%
DTZ
0.026
-18.8%
WCN
0.023
21.1%
TZN
0.019
-17.4%
A8G
0.21
20%
FAU
0.01
-16.7%
MGU
0.006
20%
PL9
0.005
-16.7%
ABE
0.037
19.4%
UNT
0.005
-16.7%
JAV
0.097
18.3%
BRY
0.011
-15.4%
HMD
0.039
18.2%
CMP
0.235
-14.5%
SLA
0.13
18.2%
AGN
0.15
-14.3%
NYM
0.053
17.8%
GEN
0.006
-14.3%
EAU
0.14
16.7%
LRM
0.018
-14.3%
INF
0.007
16.7%
M4M
0.006
-14.3%
XST
0.014
16.7%
X2M
0.006
-14.3%
KLI
0.325
16.1%
SLB
0.275
-14.1%
HVY
0.4
15.9%
NOX
0.065
-13.3%
REC
0.037
15.6%
AS2
0.007
-12.5%
AHE
0.015
15.4%
AUV
0.007
-12.5%
KOB
0.032
14.3%
MRD
0.042
-12.5%
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Mamba Exploration (ASX:M24) has commenced drilling at The Canary Project

Mamba Exploration (ASX:M24) commences inaugural drill program at Canary Uranium Project

  • Drilling commenced at Canary Uranium Project, Athabasca Basin, Saskatchewan, Canada on May 8th, 2024.
  • The Project is situated in the Mudjatik geological domain where several recent discoveries have been made.
  • Approximately 1,000-1,500 metres are planned across 3-4 drill holes, targeting shallow high-grade unconformity-related uranium mineralisation.
  • Drill plans comprise helicopter-supported diamond drilling focused on high-priority unconformity-related robust and shallow drill uranium targets refined by geophysical work completed by Standard Uranium in 2022.
  • Ideal unconformity and basement target zones on the Project lie within approximately 200-350 metres below surface.
  • One diamond drill hole will focus on the highest-priority target area along the northern electromagnetic corridor, investigating a significant resistivity anomaly coincident with modelled VTEM conductors for the first time.